Unlock Savings of Up to 50% on a Wide Selection of Items!


GI Steel Lintels:- 3mm Thick & 50 mm height, 9” / 230 mm

SKU: GIL-7308-9”/230
Manufacturer: Arpitha Exports
A quick and easy installation, Suitable for a wide range of wall thicknesses and door and window opening types. Material resistant to corrosion, Lightweight Simple to manage
₹ 1,350.00

 

Product Specifications

 
Construction
Galvanized Iron
9” / 230 mm
7308
RMT
Lintel made out of 3mm thick Galvanized Iron, perforated as per Arpitha
Industrial
Made in India

 

Purpose

Main purpose of the product is to replace conventional RCC lintels for ease of installation, time, and cost saving during construction.

 

Advantages

  • Shuttering not required.
  • Reinforcement not required.
  • Water curing not required.
  • Very simple installation; requires a few minutes for installation and brickwork construction above the lintel can be started immediately.
  • Can be used for all types and kinds of door and window openings of various wall thicknesses.

 

Availability & Specification

Available in various lengths and widths suitable for 100mm, 150mm, and 200mm thick walls and also available in custom-made widths.

9'' inch's / 230 mm

 

Lintel Installation Guidelines

 

1. Positioning:

  • Place the lintel above the opening, fully covered in cement.
  • Make sure the walls on both sides of the opening are level.

 

2. Mortar Application:

  • Put a layer of cement on top of the lintel.
  • Continue laying blocks as usual.

 

3. Bracket Use:

  • If there's a column on one side and a wall on the other, use a bracket that fits.
  • Secure the bracket with 3-4 anchor bolts (8 mm wide, 100 mm long).

 

4. Lintel Support:

  • Put one end of the lintel on the bracket and the other end on the wall.
  • Apply cement on the lintel and keep laying blocks.

 

5. Jack Support:

  • For spans longer than 1 meter, use a support (jack) under the lintel.
  • Complete the first two rows of blocks on the first day.
  • Repeat this on the second and third days.

 

6. Ongoing Work:

  • From the fourth day, work can continue without interruptions.
  • Take away the jack after the 5th day.

 

7. Span Considerations:

  • Spans over 2.25 meters will need at least one welded joint.
  • For spans over 2 meters, secure the lintel to the roof with 10 mm rods and anchor bolts every 1.5 meters.
  • Make sure the anchor bolts are set into the wall when finished.