Product is used as Floor and Wall covering profile for expansion joints. These joints improve the finish while allowing for contraction and expansion without affecting appearance. They are easy to assemble on-site. Made of a 2 mm thick powder-coated aluminum profile.
₹ 2,100.00

 

Product Specifications

 
Construction
Aluminum
250 mm (2mm Thick) 
7308
RMT
Aluminum Expansion Joint Plate made out of Aluminum, perforated as per Arpitha
Industrial
Made in India

 

Purpose

Arpitha aluminum expansion joints are used for gaps between floors and walls, as well as wall corners.
They have a durable aluminum base and cover to prevent leaks through the joints.

 

Advantages

  • Enhances aesthetics
  • Covers uneven plastering.
  • Easy to install.

 

Availability & Specification

  • Powder Coated Expansion Joint Profile made of Aluminum Profile Thickness of 2mm /2.5mm / 3mm.
  • Powder coated aluminum suitable for wall expansion gap of 25mm / 50mm / 75mm / 100mm.
  • Powder coated 1100 grade for expansion joint widths of 50mm, 150mm and 200mm and in different colors.
  • Note:-Minimum Recommended with powder coating for ceiling & column
 

Wall Expansion Joint Installation

For Wall Expansion Joint

  1. Clean Surface: Clean the wall on both sides of the expansion joint gap for 4 inches (100 mm).
  2. Smooth Finish: Grind uneven areas for a smooth finish and remove dust with an air blower.
  3. Apply Adhesive: Use polymer-based adhesive from Arpitha Exports on the cleaned surface.
  4. Affix Waterproof Sheet: Press the PVC waterproof sheet firmly onto the adhesive, ensuring no air pockets.
  5. Install Plaster Stop Bead: Place Arpitha galvanized iron plaster stop bead along the edges of the gap, with folds facing each other. Nail it to the wall.
  6. Add Plaster Mesh: Spread 6 inches (150 mm) Arpitha Plaster Mesh over the stop bead on both sides and nail it to the wall.
  7. Apply Cement Mortar: Cover with a thin coat of cement mortar and allow curing for 1-2 days.
  8. Install PVC Profile: Slide the PVC profile onto the stop bead on both sides, bridging the gap.
  9. Finish Installation: Apply cement mortar to level the PVC profile on both sides.

For Powder Coated Aluminum

  1. Clean Surface: Clean the wall on both sides of the expansion joint gap for 25 mm.
  2. Smooth Finish: Grind uneven areas for a smooth finish and remove dust with an air blower.
  3. Apply Adhesive: Use a 3:1 mixture of Mapei Adhesilex PG4 parts A and B on both sides of the gap.
  4. Install Water Barrier: Fix the 100-mm-wide waterproof PVC-coated fabric water barrier on the cleaned surface, pressing firmly to avoid air pockets.
  5. Install Aluminum Profile: Fix the 125 mm wide powder-coated aluminum profile (1.5 mm thick, 2.5 meters long) over the water barrier using gaskets and suitable screws.